Lead Corners are 90 degree formed lead for lead lining wall corners before drywall is installed. Lead corner angles must be the same height of the lead shielding (7 foot minimum). These are 84" long, if a different height is required, please email us for a custom quote.
.
Lead Batten Strips go at the vertical drywall joints before the lead backed drywall is installed. If you have wood stud framing, the lead batten strip will go on the face of the stud. If you have a metal stud, the batten strip can go on the face or inside the stud cavity. These are 84" long, if a different height is required, please email us for a custom quote.