---
type: page
title: Floor Lead Lining Installation Notes
handle: floor-lead-lining-installation-notes
url: >-
  https://lead-glass-pro.myshopify.com/pages/floor-lead-lining-installation-notes
published_at: '2023-10-07T14:13:43.000Z'
---

*   USE A GOOD CONTACT CEMENT OR FLOORING ADHESIVE MASTIC. A LOW VOC ADHESIVE MAY BE REQUIRED IN SOME STATES OR ACTIVE MEDICAL ENVIRONMENTS.

*   MAKE SURE FLOOR IS CLEAN AND FREE OF ALL DUST OR OILS.

*   MAKE SURE IS FLOOR IS PREPARED, SMOOTH, LEVEL AND FLAT AS ANY IMPERFECTIONS WILL "PHOTOGRAPH" THROUGH (LEAD IS NOT A "FILLER").

*   MAKE SURE LEAD IS DEGREASED AND FREE OF ALL OIL.

*   OVERLAP ALL JOINTS BY A MINIMUM OF 1/2"+.

*   USE GOOD VENTILATION AND FAN / EXHAUST ALL AIR TO OUTSIDE OF BUILDING; AWAY FROM ANY OCCUPANTS IN SURROUNDING AREAS.

*   NO OTHER TRADES OR PERSONS SHOULD OCCUPY ROOM DURING INSTALLATION OF FLOOR LEAD.

*   USE HEAVY FLOOR ROLLER OR HIT WITH BLOCK OF WOOD AND MALLET TO SET LEAD FLAT.

*   USE ALL CORRECT LEAD HANDLING PROCEDURES. (IE: NO EATING, DRINKING OR SMOKING IN LEAD WORK AREAS, WASH HANDS AFTER HANDLING, DO NOT CUT WITH POWER TOOLS, ETC.)

*   PROTECT LEAD FROM FOOT TRAFFIC "TRACKING"

*   USE PROTECTIVE GLOVES AND DUST MASKS.

*   MAKE SURE YOU ARE IN COMPLIANCE WITH ALL OTHER STATE, FEDERAL OR LOCAL SAFETY CODES, LAWS, REGULATIONS AND REQUIREMENTS IN YOU AREA.

*   FLOOR LEAD INSTALLATION MUST BE PRIOR TO FINISH FLOORING, CABINETRY OR EQUIPMENT INSTALLATION.